King George VI Lift Bridge Maintenance Work

November 14, 2023
For Immediate Release

Central Elgin, ON – The County of Elgin will be undertaking maintenance work on the King George VI Lift Bridge from Wednesday, November 15th at 8:00 AM – Thursday, November 16th at 4:00 PM. As a result, the Lift Bridge will be closed to vehicular traffic during this time. Pedestrian traffic is expected to be opened.

Residents and visitors are encouraged to utilize the detour highlighted below while travelling to and from Port Stanley during the bridge closure. This approximate 4km detour will re-direct traffic utilizing Carlow Road, Warren Street and Colborne Street.

Businesses will remain open throughout this closure period. The County of Elgin apologizes for any inconvenience that this closure may cause.

 

King George VI Lift Bridge Detour Route

 

–30-

 

For additional information, please contact:

Peter Dutchak
Director of Engineering Services
pdutchak@elgin.ca 
(519) 631-1460 x124

 

Our offices will be closed on Monday, November 13th. Regular business hours will resume on Tuesday, November 14th.