Notice: Highway 3 Closures for Kettle Creek Foundation Field Investigation

Stantec Consulting Limited, on behalf of the Ontario Ministry of Transportation (MTO), has scheduled a foundation field investigation for Kettle Creek from April 25th to April 29th, 2024. To accommodate the mobilization and demobilization of the drill rig, full nighttime closures on Highway 3 between Wellington Road and Centennial Avenue will be required.

The anticipated schedule for these closures is as follows:

  • Thursday Night (April 25th): 8 p.m. – 6 a.m.
  • Friday Night (April 26th): 8 p.m. – 8 a.m.
  • Saturday Night (April 27th): 7 p.m. – 9 a.m.
  • Sunday Night (April 28th): 7 p.m. – 6 a.m.

Drilling will take place during the daytime. While these are the planned closure times, the full duration may not be required.

Thank you for your understanding as this important field investigation is carried out. For more information on this project, please visit https://www.highway3elgin.ca/index.html.

For additional information, please contact:

Kevin Welker, P.Eng.
Project Manager, Stantec Consulting Ltd. 
comments@highway3elgin.ca 

226-919-5979

Deanna Pizycki, P.Eng.
Project Engineer, Ministry of Transportation  
comments@highway3elgin.ca

519-859-7492